Results 1 to 3 of 3

Thread: Live from Number Majillion for Takeoff at JFK

  1. #1
    Moderator Matt Molnar's Avatar
    Join Date
    Apr 2005
    Location
    New York
    Posts
    9,302

    Live from Number Majillion for Takeoff at JFK

    Aboard AA127 to San Diego. Scheduled pushback was 6:25, actual was about 10 minutes later. After taxiing a few minutes the captain just said the line is ridiculously long and it'll be at least 40 minutes. Some early critiques...Terminal 8 is disgusting. The bathroom stalls all have the locks broken off. There is no decent food and no good stores past security. The 757 seems semi-ancient but pretty clean. The flight is pretty full but I lucked out and was able to move to an aisle seat with no one in the middle. PIA's "Colours of the Desert" 747 just passed with a beautiful tail. That's all for now!
    Ladies and gentlemen, this is your captain speaking. We have a small problem.
    All four engines have stopped. We are doing our damnedest to get them under control.
    I trust you are not in too much distress. —Captain Eric Moody, British Airways Flight 9

  2. #2
    Senior Member
    Join Date
    Apr 2005
    Posts
    8,285
    Yep sounds just like the American Experience. Atleast the terminal will be done in a year or so.

  3. #3
    Senior Member
    Join Date
    Jun 2005
    Location
    Huntington
    Posts
    344
    Well, it's really only half the terminal that will be done. There are two pieces that are getting built right now, Concourse B and the Main Terminal Building. Concourse B is the "finger" further from the road of the two. The Main Terminal Building is the western piece of the ticketing lobby and is right up against the road. Concourse B is scheduled to open in May 2007 and the Main Terminal Building is scheduled to open in June 2007. If American can find the funds and a good reason to keep going, there is the whole east side of the terminal left to go. That piece would almost double what is already there! (I'm keeping my fingers crossed.) Regardless, terminal 8 is coming down when the current construction is completed.

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •