Results 1 to 2 of 2

Thread: Boeing Completes Ultimate-Load Wing Test on 787

  1. #1
    Senior Member
    Join Date
    Apr 2005
    Location
    The weather sucks in Seattle
    Posts
    4,899

    Boeing Completes Ultimate-Load Wing Test on 787

    March 28 /PRNewswire-FirstCall/ -- Boeing (NYSE:BA - News) today completed the ultimate-load wing up-bending test on the 787 Dreamliner static test unit. During the testing, loads were applied to the airframe to replicate 150 percent of the most extreme forces the airplane is ever expected to experience while in service.

    The wings were flexed upward by approximately 25 feet (7.6 meters) during the test.

    The initial results of the ultimate-load test are positive. More extensive analysis and review are required before the test can be deemed a success.

    http://finance.yahoo.com/news/Boeing-Co ... l?x=0&.v=1
    The problem with socialism is that you eventually,
    run out of other people’s money.
    ” - Margaret Thatcher

  2. #2
    NLovis
    Guest

    Re: Boeing Completes Ultimate-Load Wing Test on 787

    Very good. Were on track :borat:

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •