PDA

View Full Version : Question about JFK's T4 Construction



RDU-JFK
2005-09-09, 04:45 PM
Hi all:

Does anyone remember how JFK's T4 operations were affected when the IAB was torn down and the new T4 was being built? Which gates did the airlines use? I assume at some point they had to move planes around, or split operations.

Thanks in advance.

mikephotos
2005-09-09, 05:56 PM
It was done in sections. Old "IAB" gates were used on one side while old gates/wings were torn down for rebuild on the other. Lots of hardstand/planemates activity during that period.

Mike

rod945
2005-09-22, 05:28 AM
It was done in sections. Old "IAB" gates were used on one side while old gates/wings were torn down for rebuild on the other. Lots of hardstand/planemates activity during that period.

Brilliant stuff whats it called? [^]

rod945
2005-09-22, 05:28 AM
It was done in sections. Old "IAB" gates were used on one side while old gates/wings were torn down for rebuild on the other. Lots of hardstand/planemates activity during that period.

Brilliant stuff whats it called? [^]